Tunnel Projects Tunnel Projects Tunnel Projects Tunnel Projects Tunnel Projects Tunnel Projects Tunnel Projects Tunnel Projects Tunnel Projects Tunnel Projects Tunnel Projects Tunnel Projects Tunnel Projects Tunnel Projects Tunnel Projects Tunnel Projects Tunnel Projects Tunnel Projects Tunnel Projects

Feature:  Brisbane North-South Bypass Tunnel (see photos)

Design, documentation and construction approval for seven major temporary buildings. All buildings were part of the construction process for the tunnel as follows:

    • Building 1) Precast Manufacturing Plant at Eagle Farm Airport – 44m x 119m with 2 overhead cranes
    • Building 2) Shafston Avenue acoustic building at midway portal – 53m x 25m x 16.5m high
    • Building 3) Road Header acoustic building – 22m x 55m x 20m high. Located at the northern portal
    • Building 4) TBM (tunnel-boring-machine) acoustic building – 128m x 96m x 30m high. Located at northern portal site , this building features 40 tonne SWL cranes (3 off) and a 260 tonne SWL crane. Crane runways span up to 18.4m across the TBM machines)
    • Building 5) TBM workshop – Located at northern portal site, 58m x 76m workshop with crane
    • Building 6) 3-storey site offices (2 off) at the northern portal site
    • Building 7) Gibbon Street acoustic building – 64m x 52m x 17m high. Located near the southern portal, this building features a multi-stage erection and partial demolition to facilitate a tight site and to receive the second crane. The cranes are a 100 tonne SWL semi-portal and a 260 tonne SWL bridge crane
    • Entrance canopies at Shafston Avenue, Wooloongabba and Bowen Hills. Design, documentation and construction approval for the three wave-form canopies featuring louvred smoke and exhaust penetrations, custom fabricated curved beams, Kalzip tapered/pre-curved roof cladding and Alucobond ceiling cladding.